since 05 February 2011 :
View(s): 947 (9 ULiège)
Download(s): 2987 (9 ULiège)
print        
Ali Katebi

Techniques and Steps of Project Physical Progress Control through the Comparison of Site Images with Prototype Models
(Literature Review)

(Volume 85 - Année 2016 — Actes de colloques — Special edition)
Article
Open Access

Attached document(s)

original pdf file

Abstract

Evaluation of project physical progress through statistical data prepared by project staff and project managers may cause problems in the quality of the obtained results due to human error and approximations. Therefore, making use of image and video items of as-constructed situation of projects, and their comparison with prototype models can yield detailed reports on the status of project progress. Producing site images in the form of as-built data, image analysis through image processing techniques, and comparison with prototype models is a new and rapidly growing method for preparing project progress reports.

Keywords : as-constructed visual status, project physical progress, project prototype models, visualization

To cite this article

Ali Katebi, «Techniques and Steps of Project Physical Progress Control through the Comparison of Site Images with Prototype Models», Bulletin de la Société Royale des Sciences de Liège [En ligne], Volume 85 - Année 2016, Actes de colloques, Special edition, 7 - 20 URL : https://popups.ulg.ac.be/0037-9565/index.php?id=5138.

About: Ali Katebi

Assistant Professor, Kharazmi University, Engineering faculty, Dept. of Civil Engineering, Mofateh Ave, Tehran, Iran.